Welcome to The Moray Council Website
Graphical or Text l Accessibility l Sitemap l Location Maps l Contact Us l Help l Information Rights
Planning - How to Make a Listed Building Application

How Long will it Take for a Decision to be Made 

Our target for issuing a decision is 8 weeks form the date of receipt of a valid application.

Four copies of the D1 Application Form must be completed

Back to top


Location Plan

The Location Plan must be to a scale of at least 1:2500 or 1:500. These can be provided by the Council. Please refer to our leaflet – Note for Applicants. (PDF format, 1 page, 76.7 KB)

Four copies of the Location Plan are required.

Back to top


Site Plan

Four copies of the Site Plan are required

Back to top


Plans for an Extension or Renovation or New Buildings

These plans must be to a scale of not less than 1:500 or 1:200 . Please refer to the leaflet Note for Applicants. (PDF format, 1 page, 76.7 KB)

Four copies of competent plans including elevations/sections as necessary and any demolition involved are required

These should be coloured to show new works and drawn to scale or for very simple proposals fully dimensional drawings may be acceptable.  Please refer to the leaflet Note for Applicants  (PDF format, 1 page, 76.7 KB)

Back to top


Contact Details

If you need more information please Tel: 01343 563501

Back to top